Build Time
Date: 1/17/12
Empennage 202.5
Wings 400.1
Fuselage 631.8
Finish Kit 104.1
Firewall Forward 18Total 1346.5
Categories
-
Recent Posts
Author Archives: DonAlexander
Brake cylinders
11/22/11 2.5 hours Installed the four brake cylinders on the rudder pedals. This amounted to positioning the pedals, installing the top of the cylinder and then drilling the bottom hole in place. Pretty simple actually.
Posted in Uncategorized
Comments Off
Fuel Lines, Brake vent, and Rudder Pedals
11/21/11 3.6 hours The 5202 aluminum tubing arrived Aircraft Spruce. Shipping on the 6′ lengths was about $15. Originally, I had ordered it in 12′ lengths. AS dropped me an email saying my $60 order would cost $144 to ship, … Continue reading
Posted in Uncategorized
Comments Off
Doghouse, riveting, and misc.
11/20/11 1.6 hours I carefully figured out how to square the doghouse up. It meant moving two platenuts, installing two more platenuts, and running a tap through all of the platenuts. What a difference that last step makes! The screws … Continue reading
Posted in Uncategorized
Comments Off
Mounting Strobe Power Pack, Rebuilding the Doghouse
November 19, 2011. 3.9 hours and lots of cogitating. I have figured out 3 ways to mount the Whelen strobe power pack on my plane and built two of them. The third way is to mount it on the deck … Continue reading
Posted in Uncategorized
Comments Off
Lots of different things
11/13/11, 3.1 hours I started off today by trying to fix the doghouse cover over the fuel pump. I spent an hour working on sorting out the problems – and there are several. It just got too frustrating and I … Continue reading
Posted in Uncategorized
Comments Off
Installed the magnetomer and the shelf
11/12/11 2.6 That’s not misprint – I worked the same number of hours today as yesterday. As hard as it is to believe, all I accomplished was getting the magnetometer shelf finished and installed. The shelf itself is pretty simple. … Continue reading
Posted in Uncategorized
Comments Off
Magnetometer shelf and fixing an oversight
11/11/11 2.6 hours After talking to another builder friend about how he routed his wiring, I realized that I forgotten to put two holes in the F707 bulkhead. With all the control tubes, the bell crank and the AP servo, … Continue reading
Posted in Uncategorized
Comments Off
Fuel line
1 hour Nothing accomplished beyond a lot of head scratching. Not sure how to install the fuel line to the Andair valve, passing it through two plastic bushings along the main spar, through the gear web, a couple of bends … Continue reading
Posted in Uncategorized
Comments Off
Plumbing the fuel system vents
10/29/11 2.0 hours, 535.1 Fuselage Build Time, Total Build Time 1148.1 It has taken a fair amount of preparation to get to this point – most of it rather frustrating. In any event, I’ve been reading about problems with poorly … Continue reading
Posted in Uncategorized
Comments Off
Fuel Pump Housing
10/29/11 3.1 hours, 533.1 Fuselage Build Time, Total Build Time 1146.1 Fit, drilled, deburred, dimpled, and riveted the fuel pump housing, including installing 8 #6 platenuts. On the bright side, I located 6 out of the 8 correctly. The other … Continue reading
Posted in Uncategorized
Comments Off