Plumbing

11/26/11 3.6 hours

Finished the fuel tank vents, except for installing one more adel clamp on each side and screening the forward facing vents. Next I drilled the brake line exit holes next to the gear leg exit hole. Worked on the rudder and brake assembly next. Figured out where to mount the rudder pedals to suit me (I think – and hope that I don’t change my mind when I put the seat cushions in). Started installing the hydraulic lines for the brakes. I expect to finish this task tomorrow and hopefully will connect the rudder cables and then start the top section of the forward fuselage where the panel and windscreen will go.

This entry was posted in Uncategorized. Bookmark the permalink.

Comments are closed.